Buy from Alan Wright the Inventor on this site

Summary of Phase One and Two Plumbing Work

Flow&Return
Flow&Return
Downstairs Heating
Downstairs Heating
Upstairs Heating
Details of Upstairs Skirting Board Heating

Existing gas boiler to be replaced with a 18 KW gas boiler

Twin 22mm Copper Pipes installed at ceiling height.